It’s all in the detail!

Big jobs like this need to be broken down into smaller bite-sized pieces, and so we’ve been trying to work our way through the compartments one at a time where possible.

L516_Jan13_pic01

But its the small jobs that seem to occupy the time, and new timber mouldings needed to be manufactured to replace the old ones that were removed during re-wiring work.

At the Rowling workshop at Engadine, the wood machinery was set up to machine replacements, and the results are a good match.

L516_Jan13_pic02

Several lengths were machined.

L516_Jan13_pic03

Back at the shed, they receive a coat of undercoat.

L516_Jan13_pic04

We also undercoated the air vents at the same time. These were removed to access the cable chases through the roof line, and will be topped off with Manilla prior to re-fitting.

L516_Jan13_pic05

The roof was sanded prior before applying any undercoat.

L516_Jan13_pic06

In some places, this revealed the original red cedar under the paint work.

L516_Jan13_pic07

For a while there, the roof was looking like patch work, with light fittings dangling from the roof…

L516_Jan13_pic08
L516_Jan13_pic09

But patience pays off, and one by one, the lights are re fitted.

L516_Jan13_pic10

And then the shades were added.

L516_Jan13_pic11

One of the original berth light fittings were refurbished, and fitted in place to remind us of where we are heading…and what we’ve to look forward to.

L516_Jan13_pic12

From the outside, its also looking good.

L516_Jan13_pic13

But there is always more to be done.